← Back to store ShreeBalajiGlobal
Site & shelter sheeting — Scaffold, stockpiles, shelters
Scaffold, stockpiles, shelters

Site & shelter sheeting

Site sheeting is structural in everything but name — once it is tied to a scaffold it carries wind into the frame. Heavy-gauge tarps with rope hems and close eyelet pitch let the load spread across the tie line, and flame-retardant grade is available where hot works are nearby.

For an accurate tarpaulin quote, send the cover length, width, use case, expected exposure and required fixing points. We will recommend a suitable GSM, edge reinforcement and eyelet spacing.

What it has to survive
01Wind load transferred straight into the scaffold tie line.
02Hot works and sparks in the same elevation.
03Repeated strike, fold and reuse across multiple sites.
04Weather-tight temporary shelters over open slabs.
Job sheet
WEIGHT200 / 300 GSM
GRADEStandard · flame-retardant
EYELETSBrass @ 300 mm
HEMRope + webbing
ROLLUp to 6 m wide
Pair with debris netting from the net range where screening matters more than a full weather seal.
Back to applications